Typical lead time for ATS Deferred Submittals in as little as 5 business days.

ATS10

SYSTEM DETAILS

Our ATS10 drawing features typical tie-down system details. This page is important for installation and helping the installer get familiar with the AutoTight® nomenclature.

ATS11

RUN TYPE ELEVATIONS

Our ATS11 drawing features detailed elevation of every run type. Illustrating rod, plate, nut,coupler & TUD size the ATS11 sheet is an installers guide to properly connecting each run type.

ATS12

ANCHOR BOLT DETAILS

Our ATS12 drawing features the anchor bolt details. Illustrating rod, plate, depth & placement this drawing is the best guide for accurate installation. All required hardware is tabulated for simplicity.